Programme summary
Clean temporary power for commissioning with documentation matched to consultant FAT expectations.
Mobilisation narrative
A mission-critical fit-out needed stable voltage and noise limits while permanent UPS paths were proven. FM Rental staged cable runs and generator placement to keep exhaust away from air intakes. Test records were formatted for the commissioning dossier the client filed with their banked load model.
Fuel containment and bund checks were photographed for the HSE file. Off-hire was only released after the clients energisation sign-off to avoid any gap in backup cover.
